A report claim ledger maps each material statement to a permitted evidence item or calculation. It is an internal verification record, not a demand to expose private source material in the published report. The prompt should distinguish a raw observation, an arithmetic result, and a judgment. Require exact units, denominator, and status definitions for every count or rate. If records disagree, retain the conflict and name the owner who can resolve it; do not select the more convenient value. Reconcile totals deterministically before drafting and recheck every number after editing, because a late wording change can turn a correct count into a misleading claim.
Report prompts: reconcile every claim with the packet
Operational case
The North Quay packet has 47 records. A worksheet says 38 current, 6 overdue, and 3 pending validation; the sum is 47. A draft sentence says 'nine inspections need immediate action' by adding overdue and pending. That arithmetic is valid as a combined count but its label is not: pending validation is not the same as overdue. The ledger rejects the sentence. It accepts 'six overdue inspections require follow-up; three statuses await validation.' A chart showing 6 of 47 overdue must keep 47 as its denominator and label pending separately. If a second sheet reports seven overdue, the discrepancy remains open until a record-level reconciliation identifies the difference.
Claim C1: 47 records in frozen packet; verify record IDs are distinct.
Claim C2: 38 current + 6 overdue + 3 pending = 47.
Claim C3: overdue share = 6/47, approximately 12.8%.
Blocked: '9 require immediate action' conflates two statuses.
Conflict: second sheet says 7 overdue -> hold claim for record review.Performance and operating cost
A single pass over N records builds counts in O(N) time and O(K) space for K status buckets; a record-ID check may require O(N) additional space. A claim ledger adds one review decision per material statement, but makes corrections cheaper than rereading the full report after every revision. Arithmetic should be performed by a deterministic calculation or spreadsheet cell, not trusted to an unverified prose generation. Reconcile the final exported file too; correct draft text does not prove the output artifact retained the correct numbers.
Common Mistakes
- Do not turn a valid sum into an unsupported operational category.
- Do not calculate a rate without naming its denominator.
- Do not conceal a conflicting count by selecting the first sheet.
Connected lessons
- Prompt engineering applications
- Prompt Engineering
- Aggregation prompts: pin the denominator and recompute the rate
- Evidence IDs: make generated claims auditable against supplied records
- Numeric prompts: let code calculate and the model explain
- Document prompts: define the reader's decision before drafting
- Editable report prompts: inspect structure and rendered pages
- Slide prompts: one claim, supporting evidence, usable order
- PDF export prompts: verify the delivered file again
- Project: deliver a North Quay maintenance briefing
- Document and presentation prompt decisions
Continue with: Survey prompts: release findings with explicit scope.
Continue with: Analytics prompts: turn a metric packet into a bounded decision.
