A scenario is a conditional calculation, not an observed future. List each adjustable driver with value, units, owner, approval status, and time window. Start from a frozen baseline forecast, apply only approved and measurable assumptions, and show the resulting delta. If a driver has no defensible effect size, describe the direction of concern without fabricating a precise adjustment. Scenarios can be useful for capacity planning even when their probabilities are unknown, but the prompt must not mix a worst case with an expected-value forecast or silently double-count overlapping changes.
Forecast prompts: keep scenarios separate from predictions
Operational case
The Aster baseline for next week is 54 kits. Marketing proposes a depot promotion that might add eight kits, but it has not been approved. The model must report the 54-kit baseline separately from a conditional 62-kit promotion scenario. A supplier delay could reduce available stock, not necessarily change customer demand; that belongs in the inventory decision rather than being subtracted from demand. The planner sees which assumptions are unapproved and which quantities are merely planning inputs.
Baseline forecast: 54 kits
Promotion scenario: +8 kits if approved -> 62 kits
Approval: pending, not in baseline
Supplier delay: stock constraint, not demand reduction
Scenario probability: unknownPerformance and review cost
For S independent scenarios and D drivers, a direct review is O(SD); interacting drivers may require a more careful model. Keep the ledger short and traceable, since long lists of speculative adjustments can outgrow the signal in the baseline. A conditional scenario helps a decision only when its assumptions can be checked before inventory is committed.
Common Mistakes
- Do not report 62 kits as the baseline while promotion approval is pending.
- Do not subtract a stock shortage from customer demand.
- Do not assign a probability to a scenario without evidence.
Connected lessons
- Production prompt engineering
- Prompt Engineering
- Capacity prompts: check units, headroom, and a failed worker
- Research synthesis release: expose the method and its limits
- Forecast prompts: define target, horizon, and time grain
- Forecast prompts: enforce the as-of data boundary
- Forecast prompts: distinguish missing weeks from zero demand
- Forecast prompts: compare against a rolling baseline
- Forecast prompts: label intervals and check coverage
- Forecast prompts: gate inventory recommendations on evidence
- Project: review Aster depot kit forecasts
- Forecast prompt decisions